Surveying & Soil Testing Posted on July 28, 2017 Posted in Building- Phase 2 Progress Surveying of the building addition was done on July 15, and soil testing was done July 25 (pictured). Looking forward to breaking ground on our 12,000 square foot Phase Two soon!