The frame is going up on Phase 2!
The frame is going up on Phase 2!
Thanks to Paul Conn for these excellent aerial photos of the current status of Phase 2 construction!
Digging grade beams. Forms set in place. 8” fire line work. Fire line work. Electrical panels installed. Corner of grade beam at pier location.
Concrete Subcontractor Shooting Gridlines Receiving Rebar Steel and Ties for Piers Tying Cages Up to the Sky Up to the Sky
Surveying and Establishing Final Grade – 3/9/18: Receiving New Electrical Service Panel – 4/11/18:
Here’s a look at the current status of the building project from up above. Thanks to Paul Conn for these drone photos!
Up close & personal with Phase 2 construction! Up Close! Smoothing out
A look at our contractors hard at work digging the foundation Phase 2: Rain or Shine